To stake out to the design elevation
To measure your position relative to an elevation in an RTK or conventional survey:
- Tap
and select Stakeout / Elevation.
- Enter the Design elevation.
- Enter the As-staked name and Code.
- Enter a value in the Antenna height or Target height field and make sure that the Measured to field is set correctly.
-
Tap Start.
The coordinates of the current position and the distance above (cut) or below (fill) the design elevation are shown.
Unless you are using a conventional instrument that supports tracking, the values appear only after you have taken a distance measurement.
-
When the point is within tolerance, tap Measure to measure the point.
- Tap Accept to store the point.
- If you selected the View before storage option, the staked deltas you selected in the Stakeout options screen are shown. Tap Store.